Unless the septic tank is undergoing a repair or an evaluation it is not necessary to be pumped. If it is a plastic septic tank and is pumped and will be used in the future, it should be immediately refilled with water. The same is true for a concrete tank, although a concrete tank can be re-filled within a week and typically not have any damage risk.